Thursday, February 13, 2020

Scientific Management Essay Example | Topics and Well Written Essays - 2000 words - 2

Scientific Management - Essay Example Scientific management therefore is also considered as one of the earliest attempts to actually apply scientific methods on engineering processes and the management. Taylor offered four important rules which form the basis of the scientific management and are still considered as important contribution towards the overall theory of management. It is however, important to understand that as the industrial advancement took place and more and firms entered into the market, the overall ideas on management and their application in real life situations started to change. With the passage of time, new and more innovative methods of management and labor productivity were introduced which rendered scientific management only as a discipline limited to industrial engineering. Many therefore argue that scientific management has particular relevance for the modern day organizations and has no present day significance. Scientific management as a discipline started to emerge in the 19th century when industrial revolution started to take place. Industrial revolution necessitated the use of best practices for utilizing the skills of the labor to their maximum. It advocated the use of optimizing ways in which tasks are to be performed in most efficient manner and tasks are simplified enough that labors could be trained to perform various sequences of the tasks easily.( Smith, & Boyns,2005) Prior to the introduction of scientific management, work was mostly performed by the craftsman holding monopoly over the way their skills were traded and how they decided to perform their jobs. Scientific management however, took a step further and converted the jobs into series of simple tasks which can be easily performed by training any skilled and semi-skilled workers. The overall purpose of scientific management therefore was to ensure that jobs are simplified and further training can be imparted so that tasks can be

Saturday, February 1, 2020

Models of Integration Implementation Research Paper

Models of Integration Implementation - Research Paper Example Any software development procedure is divided into numerous logic stages that permit the developer to consolidate work competently, in order to build a software product of the necessary functionality within a precise period and financial plan. This model is a progressive scheme process, in which advancement is seen as flowing progressively down, like a waterfall, over the phases of formation, commencement, analysis, scheme, assembly, testing, and upkeep. According to this model, each stage must be finalized before the subsequent stage can begin (Petrice, 2002). This model traces its roots in the construction and manufacturing industries, which comprise highly organized physical settings in which after-the –fact fluctuations are excessively inflated, if not unbearable. This hardware sloping model was merely adjusted for software development at the time for the reason that no software development approaches existed. Winston frequently quotes formal explanation of this model as a 1970 article. He however did not specifically use the word waterfall in the article. He termed the model as an example of faulty, non-working model (Petrice, 2002). According to Royce, the software in request is premeditated and a blue print is drawn for implementers or coders to trail. Once design is thorough, an application of that plan is made by coders, and just before the later stages of the implementation stage, distinct software components manufactured are joined to present new functionality and abridged risk over the removal of errors (Petrice, 2002). This model is not suitable for a high-level plan; it is only applicable in a low-level project plan (Petrice, 2002). This is due to lack of prototype in the earlier stages of the process, until the implementation stage. This might present a catastrophe for a high-level plan, in terms of costs and time spent, for any fault would necessities the repeat of the development process.